Holiday
The class’s opinion was that option two was the best solution. They choose this because if anything were to go wrong with the installations of the units and Dan was not supervising the installations, he would be the one assigned the blame.
I felt however that because he had booked the time off and that Jerry was a compitentent engineer, he would be able to leave for his holidays before they were all the units were installed.
US Parts
Again my opione differed from the classes’ choice. Here I choice option one instead of conforming to everyone else’s opione in which they felt option two was correct. I felt that if he had told the problem with the bolts to his superiors, they probably would have given him the go ahead anyway as USAWAY would not have found out about the bolts. Also John would be handling all the repairs when, and if, replacements were needed for the bolts and he would have had the American bolts by then.
No comments:
Post a Comment